Box 1
Container
Contains 74 Results:
View of individuals inspecting lock gates, with workers in background. Photograph taken from middle, top of miter gate. Location unknown.
Item — Box: 1, Item: 1
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1904 - 1914
Gatun locks under construction showing emergency dam gate.
Item — Box: 1, Item: 2
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1904 - 1914
Pedro Miguel locks under construction, looking north.
Item — Box: 1, Item: 3
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1904 - 1914
Flooding of lock chamber. Pedro Miguel locks?
Item — Box: 1, Item: 4
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1904 - 1914
Miraflores tug, PRR-2 barge and two other barges at Pedro Miguel locks (under construction). Silver Roll workers observing test transit?
Item — Box: 1, Item: 5
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1904 - 1914
Miraflores tug, PRR-2 barge, two other barges. unknown tug(?) further into the lock chamber and partial view unknown vessel at Pedro Miguel locks (under construction). Gold and Silver Roll workers observing test transit(?) Also notice one female in crowd.
Item — Box: 1, Item: 6
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1904 - 1914
Unknown tug at Pedro Miguel locks (under construction). Gold and Silver Roll workers observing test transit(?) Notice railroad engine, to the right of control house (under construction) in the middle of the lock chamber. Note several females in crowd.
Item — Box: 1, Item: 7
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1904 - 1914
Locks control house under construction. Testing of gates? Gatun locks?
Item — Box: 1, Item: 8
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1904 - 1914
View of S.S. Cristobal entering Pedro Miguel locks, southbound, 1914-08-03
Item — Box: 1, Item: 9
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1914-08-03
View of S.S. Cristobal exiting Pedro Miguel locks, southbound, 1914-08-03
Item — Box: 1, Item: 10
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1914-08-03
View of S.S. Cristobal exiting Pedro Miguel locks, southbound. Note female observers on the left., 1914-08-03
Item — Box: 1, Item: 11
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1914-08-03
View of S.S. Cristobal exiting Pedro Miguel locks, southbound. Note female observers on the left., 1914-08-03
Item — Box: 1, Item: 12
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1914-08-03
S.S. Santa Clara, southbound. Pedro Miguel locks., 1914-06-18
Item — Box: 1, Item: 13
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1914-06-18
S.S. Allianca, in-route from New York, entering Pedro Miguel locks. First commercial ship through the canal., 1914-08-06
Item — Box: 1, Item: 14
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1914-08-06
Tug Gatun and floating dredge through Pedro Miguel locks. Note crowd observing possible locks testing.
Item — Box: 1, Item: 15
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1904 - 1914
Tug Gatun and floating dredge exiting Pedro Miguel locks (southbound.) Note crowd observing possible locks testing. Miraflores locks and Ancon Hill in background.
Item — Box: 1, Item: 16
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1904 - 1914
Northbound tug entering western chambers at Pedro Miguel locks . Photo looking south.
Item — Box: 1, Item: 17
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1904 - 1914
Floating dredge Corozal (northbound?) entering Pedro Miguel locks.
Item — Box: 1, Item: 18
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1904 - 1914
Miraflores electrical power plant turbines.
Item — Box: 1, Item: 19
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1904 - 1914
Miraflores electrical power plant.
Item — Box: 1, Item: 20
Scope and Contents
From the Collection:
A collection of 74 photographic images, most 3¼ x 5½ inches, a few smaller. Mixed processes; some black & white, a few sepia tones. Some may be contact prints. Images selectively depicting the construction period of the Panama Canal, 1904–1914. Fifty photographs in the collection document major engineering projects: building of the locks, test transits, Culebra Cut digging, dredging operations, etc. In addition, images of iconic Canal Zone buildings during construction: Administration...
Dates:
1904 - 1914